Starting to come together

Things are moving at a pace now and slowly the building seems to be coming back together after some really, really BIG repair work.

In the basement the rear building floor has been excavated and new drainage laid to deal with the perpetual damp and flooding.  Just in the last few weeks there has been mud, followed by gravel and now there is a screed.

img_4802-min    img_4804-min

dscn1470-min-1

The drainage pipes to deal with all the water are huge!

dscn1448-min   img_4797-min

At the front of the building the ugly ramp has gone and the original stone and basement windows have been exposed – this really opens up the building and will allow natural light into the basement to make the rooms usable.  A platform lift will be installed over the small steps at the top of the ramp going down to the basement to allow access for all and the original steps up to the front door and railings along the front will be reinstated – its going to look great and will start to make visual sense with the building next door once again.

img_4772-min    dscn1439-min

On the roof the front parapet has now been rebuilt and there are lovely new (and very stable!) chimneys that are crucial for natural ventilation in the building.

img_4806-min    dscn1495-min

The flat roof behind the parapet is being constructed and all the massive structural steels are now in place.  I think we can all be sure that this building is still going to be standing many hundreds of years into the future.